The works included the installation of new refrigeration and mechanical equipment. The installed refrigeration D&B system was internal in operation to provide cooling to all the shop floor cabinets and back of house cold rooms, both chilled and frozen. All the equipment was situated on one level with the refrigeration pack and condenser situated in an internal plant room. The LT cabinet was integral and HT cabinets remote. The project was carried out inline with Morrison’s current refrigeration and mechanical specification.

View this case study

The project compromised of works associated with the full fit out of the food hall. The contract works were carried out in accordance with the Marks & Spencer food hall design format. A1 Refrigeration worked in conjunction with the M&S Store development team and Emerson Engineering Consultants to deliver this project within budget and on schedule.

View this case study

The brief was to design a refrigeration system using wholly natural refrigerants and followed a specific installation that offered a sympathetic approach to the wooden substructure of the core building construction.

View this case study